LO3 Risk Assessment

Probability Key:

1

Unlikely 

2

Likely 

3

Very likely 

 

Impact Key:

1

Low

2

Medium 

3

High

Probability and impact levels on a scale from 1 to 3: 

Hazard description 

Project phase

Impact description

Probability

Impact 

Risk level 

Control measures 

Risk of tripping on wires from the equipment 

Production

Could cause injury which means recording will be halted 

1

1

Low 

Watch surroundings or make sure equipment is out of the way 

Risk of spilling drinks on the equipment

Production

May destroy the equipment

1

2

Low 

Make sure that all drinks are kept away from the equipment

Risk of someone tripping over chairs

Production

someone could be injured

2

3

Medium     

Makes sure that all the chairs before  recording 

Risk of someone tripping over bags

Production

someone could be injured

2

2

Medium 

Make sure that the bags are stored correctly and are out of the way

Risk of the microphone

hitting someone

production

Could cause injury and damage which would result in recording being halted

1

3

Medium

Do not mess with the mic stands and leave them alone once they are in place

Comments